
A sagged overhead cable coming into contact with passing trains was to blame for malfunctions in both the power supply and signalling systems that triggered a five-hour service suspension along the Tseung Kwan O line last month, Hong Kong’s railway operator revealed on Friday.
The MTR Corporation also vowed to bolster the “overall resilience of the railway network” and strengthen response capabilities…
阅读更多(Read More)